Page 20 - Shimadzu Nexera Prep
P. 20

Options




                     Suited to the Target Preparative Method




                     Column Hub
                     Column Holder
                     Column Holder SLIM

                     Preparative columns with an I.D. of 20 mm to 50 mm as well as manual switching valves can be attached. The valves can be used
                     for column switching.

                     Speci cations
                                         Installable Valves          Installable Columns            Size
                         Column Hub  Automatic Switching Valves  Up to 4 pcs  Preparative Columns 2 pcs* 5   Analytical Columns 6 pcs* 5  W 260 × H 560 × D 500 mm
                        Column Holder  Manual Switching Valves  Up to 4 pcs  Preparative Columns 2 pcs  Analytical Columns 1 pc  W 250 × H 465 × D 400 mm
                       Column Holder SLIM  Manual Switching Valves  Up to 5 pcs  Preparative Columns 2 pcs*   Analytical Columns 1 pc  W 110 × H 625 × D 500 mm
                                                                             6
                     *5  When attaching three or more analytical columns or two preparative columns to the column hub, the optional “Column Bracket” is needed.
                     *6  If two preparative columns are attached using the Column Holder SLIM, the optional Column Clamp ASSY (P/N: 228-17701-94) is required.











                                     Column Hub             Column Holder         Column Holder SLIM

                     For Multiple Detection Triggers
                     A/D Conversion Board Kit
                     This is required for preparative work using multiple detector triggers. Expand the hardware to suit the number of detection
                     trigger channels required.

                     Degassing Units
                     DGU-403 / DGU-405

                     • A low-capacity degassing unit that uses a special fluororesin membrane.
                      DGU-403: 3 flow lines, DGU-405: 5 flow lines
                     • The maximum operating flow rate per flow line is 10 mL/min.
                     • Designed for use in analytical and preparative fractionation, this unit is used only
                      when retention time reproducibility needs to be improved during analysis.  DGU-403
                     Note: When connecting to an LC-20AP, a connection kit must be obtained separately.
                     Note: LC-20AR connection kit is required when the operating flow rate is more than 10 mL/min.


                     Helium Degassing Unit
                     DGU-10B
                     • Eliminates air bubbles, baseline undulation, drifting, etc. by purging dissolved air from
                      mobile phases.
                     • The DGU-10B can be used to degas up to four mobile phase solutions with helium gas.
                     • This unit is switched ON/OFF from the solvent delivery unit or system controller.

                                                                                             DGU-10B





        20
   15   16   17   18   19   20   21   22   23   24