Page 10 - Shimadzu EPMA-1720 Series
P. 10

Sample Mounting to Report Generation



            Offers a simple, easy-to-learn operating environment for sample mounting, image
            observation, setting of analysis conditions, data analysis, and report generation.
            Anyone can learn to use the instrument in a short period of time.








                     Mount sample and load it                              Observe the image to confirm the
                     into the instrument.                                  analysis position, set the analysis
                                                                           conditions and start analysis.






















                • Fasten the sample in the holder and mount the
                 holder to the holder base.                         • Observe the image and determine the analysis
                                                                     position and other conditions in the observation
                                                                     window.






















                • Load the holder base in the sample loading
                 chamber and close the cover.
                • Press the [IN] button to start pre-evacuation. This   • Set the analysis conditions in the analysis window.
                 process stops automatically when the set degree    • Click the [Start] button to start the analysis.
                 of vacuum is reached.
                • Use the loading rod to insert the holder into the
                 instrument.





      10
   5   6   7   8   9   10   11   12   13   14   15