Page 10 - Shimadzu EPMA-1720 Series
P. 10
Sample Mounting to Report Generation
Offers a simple, easy-to-learn operating environment for sample mounting, image
observation, setting of analysis conditions, data analysis, and report generation.
Anyone can learn to use the instrument in a short period of time.
Mount sample and load it Observe the image to confirm the
into the instrument. analysis position, set the analysis
conditions and start analysis.
• Fasten the sample in the holder and mount the
holder to the holder base. • Observe the image and determine the analysis
position and other conditions in the observation
window.
• Load the holder base in the sample loading
chamber and close the cover.
• Press the [IN] button to start pre-evacuation. This • Set the analysis conditions in the analysis window.
process stops automatically when the set degree • Click the [Start] button to start the analysis.
of vacuum is reached.
• Use the loading rod to insert the holder into the
instrument.
10