Page 16 - Shimadzu UH-X-FX Series
P. 16

UH-X/UH-FX Series — Layout/Installation


            The following figures show the standard layout of Shimadzu Universal   To install the universal testing machine, concrete foundation work is
            Testing Machines. To change the layout according to the conditions   required. When purchasing this product, design and construct the
            of the installation place or a change in system configuration, examine   foundation suitable for the conditions of the installation place
            the layout referring to these figures.              (withstand strength of the ground, occupied space, etc.), referring to
                                                                the foundation reference drawing supplied by Shimadzu Corporation.






            Occupied space recommended for the standard layout


            * For the dimensions of the testing machine loading unit and measurement controller of each type, see pp. 18 and 19.
                     Testing Machine    Recommended Occupied Space     Testing Machine     Recommended Occupied Space
             Series Name    Capacity         (W × D × H mm)     Series Name   Capacity          (W × D × H mm)
                            200 kN         2800 × 2350 × 2500                 2000 kN         4600 × 3500 × 4000
                            300 kN         2800 × 2350 × 2500
               UH-X                                               UH-X        3000 kN         5300 × 3900 × 5000
                          500 kN/600 kN    3000 × 2350 × 3000
                            1000 kN        3300 × 2400 × 3500                 4000 kN         5800 × 4300 × 6000

                                                                                               Maintenance space,
                                                                                                   approx. 500
                                         Maintenance space,
                                             approx. 500
                                                                      Leakage oil return unit
                                                                               (in pit)

                                                    Equipment  depth                                      Equipment depth

              Maintenance                 NK             D                                         NK       D
                 space,
                 approx.                                                        Pit cover
                  500
                              Equipment width                                   (prepared by user)
                                  W                                               Equipment width
                                                                                     ̬
                                 Maintenance space,   Working space,
                                     approx. 500   approx. 1000    Maintenance space,       Maintenance space,
                                                                  approx. 500                   approx. 500
                                                                                          Working space, approx. 1000



                                                                              Equipment height


                            Loading unit  Measurement
                                      controller                                           Measurement controller

                 H                                                   H   Loading unit
                     Equipment height                                                                  Floor surface





                                                  Floor surface








      16
   11   12   13   14   15   16   17   18   19   20