Page 6 - Shimadzu Nexera Series
P. 6
A New Benchmark of Intelligence
Maximizing Reliability, Minimizing Down Time
Fully Unattended Operation from Startup to Shutdown
Shutdown
The Nexera can be set to start up at a specified time, so that it can complete
auto-purge, equilibration and baseline checks in advance, and be ready for
Checking results
analysis as soon as you arrive at the lab. Moreover, the system can be set up in
advance to run without user intervention all the way from startup through
Analysis
analysis to shutdown.
complete
You can view the status and predicted analysis completion time for multiple
systems from any location via a smart device. None of these features requires any
special software.
Auto-
Diagnostics
Analysis
Auto-Diagnostics and Recovery
In rare cases, air bubbles can form in the mobile phase and cause problems if inhaled into
the pump. The Nexera has the ability to monitor baseline changes and pressure
fluctuations to check for abnormalities.
When it detects an unusual fluctuation, it can automatically pause the analysis, purge
the flow path, and restart analysis once it has confirmed recovery to normal pressure.
Pressure Analysis begins
Auto-Diagnostics for Trapped
Bubbles (Patent Pending)
Fluctuation detected
If an air bubble becomes trapped in the
pump head, it causes an abrupt drop in
Normal analysis Resume analysis
pressure, after which periodic pressure Auto-purge once stable
changes (pulsations) will occur. This can
be detected using Shimadzu’s
proprietary bubble detection algorithm
which assesses these distinctive
pressure fluctuations caused by trapped
Sample 1 Sample 2 Sample 2
bubbles to distinguish them from any (Failure) (Retry)
expected changes in pressure.
6